The debugging work in the installation process is very important, so what tips can be applied during the system debugging process of LED street lights. The following is about the skills of LED street lights in system debugging. Essence
Before the LED street lights are installed, the battery should be tested again with a battery. See if the lamp can be lit, and it is found to be discovered after the hanging is completed, and the installation and debugging cost will be increased. What are the skills in this process?
1. Time control function settings. According to the daily lighting time designed in the design scheme, the setting time control point is set according to the controller instructions. The lighting time per night should not be higher than the design value, only or less than the design value.
2. Light control function simulation. If it is during the day, after the wiring, you can use an incurable light to completely block the solar battery square array to welcomes the light (or the battery component on the controller is removed). After seeing the corresponding time, whether the lamp can light up automatically. To light up, it means that the optical control function is normal. If it cannot be lit, it means that the optical control function is invalid. It is necessary to re -check the controller settings.